Sign in
Reliable Hoshizaki operation depends on a drainage system designed for the exact ice machine, bin, and site. Drain size, slope, air gaps, elevation, and local plumbing code must be confirmed before installation.
Locate the floor sink so each required drain can run continuously downhill without sags, traps not shown in the manufacturer instructions, or long flat sections. Verify the machine outlet elevation, bin drain, dispenser drain, and any condensate connection separately.
Terminate drain lines with the air gap required by current code and the equipment instructions. Keep the floor sink accessible for cleaning and never submerge a drain outlet where wastewater could backflow toward food-zone equipment.
A qualified installer should confirm pipe size, pitch, support, venting, leak-free connections, and unrestricted flow during harvest, cleaning, and high-use conditions. Standing water, odors, backups, or gurgling require correction—not a bypass.
Plan the complete system: Browse Hoshizaki commercial ice machines, compare water filtration, and use our commercial ice guides.
My Account
Sign in or create an account to check out faster and track your orders.